Deliverables

Work Package 1

Number Name                                                                                                                                                               Due, Responsible Published/Submitted
D 1.1 Definition of retrofitting framework (M3, SFW)
D 1.2 Preliminary retrofit concept for utilization of waste-derived fuels (M8, SFW)
D 1.3 Preliminary retrofit concept for oxygen carrier aided combustion (M9, Improbed)
D 1.4 Preliminary retrofit concept for oxyfuel combustion (M11, SFW)
D 1.5 Preliminary retrofit concept for chemical looping combustion (M12, SFW)
D 1.6 Concepts for utilization and storage of CO2 (M21, SFW)
D 1.7 Final retrofit concept for utilization of waste-derived fuels (M27, SFW)
D 1.8 Final retrofit concept for oxygen carrier aided combustion (M30, Improbed)
D 1.9 Final retrofit concept for oxyfuel combustion (M30, SFW)
D 1.10 Final retrofit concept for chemical looping combustion (M36, SFW)

Work Package 2

Number Name                                                                                                                                                               Due, Responsible Published/Submitted
D 2.1 Results of co-combustion pilot test with waste-derived fuels (M23, TUDA)
D 2.2 Results of oxygen carrier aided combustion pilot test (M27, TUDA)
D 2.3 Results of oxyfuel combustion pilot test (M27, TUDA)
D 2.4 Results of chemical looping combustion pilot test (M30, TUDA)
D 2.5 Evaluation of refractory materials in pilot tests (M30, RINA-CSM)
D 2.6 Evaluation of corrosion and fouling in pilot tests (M30, SFW)
D 2.7 Evaluation of flow field in pilot tests (M30, TUDA)
D 2.8 Summary report on pilot tests (M33, TUDA)

Work Package 3

Number Name                                                                                                                                                               Due, Responsible Published/Submitted
D 3.1 Results from co-combustion tests with waste-derived fuels in commercial unit operated by Fortum (M36, SFW)
D 3.2 Results from multipollutant control tests (M36, SFW)
D 3.3 Results from co-combustion tests in commercial unit operated by RWE (M36, TUDA)
D 3.4 Results from oxygen carrier tests in commercial unit (M36, Improbed)
D 3.5 Evaluation of refractory materials after validation at commercial scale field campaign (M36, RINA-CSM)
D 3.6 Results of fouling and corrosion tests in the commercial unit (M36, SFW)
D 3.7 Results of in-bed measurements in the commercial unit (M36, TUDA)

Work Package 4

Number Name                                                                                                                                                               Due, Responsible Published/Submitted
D 4.1 Dynamic process simulation of 1 MWth pilot plant (M30, TUDA)
D 4.2 CFD simulation of 1 MWth pilot plant (M30, TUDA)
D 4.3 Dynamic process simulation of commercial boiler retrofits (M39, TUDA)
D 4.4 CFD simulation of commercial boiler retrofits (M39, CERTH)

Work Package 5

Number Name                                                                                                                                                               Due, Responsible Published/Submitted
D 5.1 Health and safety general requirements (M24, RINA-C)
D 5.2 Integrated environmental impact assessment (M39, RINA-C)
D 5.3 Integrated economic impact assessment (M42, RINA-C)
D 5.4 Integrated social impact assessment (M42, RINA-C)
D 5.5 Fluidized bed system benchmark with traditional coal power plant via risk assessment and multi-level impactassessment approach (M42, RINA-C)

Work Package 6

Number Name                                                                                                                                                               Due, Responsible Published/Submitted
D 6.1 Comprehensive overview of the project (M6, TUDA)
D 6.2 Logo and website (M3, TUDA)
D 6.3 Public workshop (M42, TUDA)
D 6.4 Draft exploitation plan (M12, SFW)
D 6.5 Final exploitation plan (M42, SFW)